Difference between revisions of "London Clapham Junction"

From World Naked Bike Ride
Jump to: navigation, search
(Added info about toilets and body painting)
(Updated info for 2014)
Line 4: Line 4:
  
 
<div style="float:left; margin-right: 2em;">[[Image:BikeWeekUK-Logo.jpg|Bike Week, 15-23 June 2013|link=http://www.bikeweek.org.uk/wnbr_london_clapham_junction]]</div>
 
<div style="float:left; margin-right: 2em;">[[Image:BikeWeekUK-Logo.jpg|Bike Week, 15-23 June 2013|link=http://www.bikeweek.org.uk/wnbr_london_clapham_junction]]</div>
<div class="facebook-linkbox" style="float:left; margin-right: 2em;">[https://www.facebook.com/events/496999943681627/ Join the Ride!]</div>
+
<div class="facebook-linkbox" style="float:left; margin-right: 2em;">[https://www.facebook.com/events/436638036471382/ Join the Ride!]</div>
 
<div class="facebook-linkbox" style="float:left; margin-right: 2em;">[https://www.facebook.com/pages/WNBR-London/182853265124724 Like our Page]</div>
 
<div class="facebook-linkbox" style="float:left; margin-right: 2em;">[https://www.facebook.com/pages/WNBR-London/182853265124724 Like our Page]</div>
 
<br style="clear: both;" />
 
<br style="clear: both;" />
  
{{Ride location next ride|Date=Saturday 8 June 2013|Time=14:45 assembly, for 15:00 departure|Location=Grant Road}}
+
{{Ride location next ride|Date=Saturday 14 June 2014|Time=14:45 assembly, for 15:00 departure|Location=Grant Road}}
  
 
==Start point==
 
==Start point==
Line 36: Line 36:
 
*15:15 Make a brief stop in Battersea Park (Carriage Drive North). If you want to wait for us there, that's fine, but please don't block the road or get undressed until we arrive.
 
*15:15 Make a brief stop in Battersea Park (Carriage Drive North). If you want to wait for us there, that's fine, but please don't block the road or get undressed until we arrive.
 
*15:30 Meet the group who started in [[London West Norwood|West Norwood]] at Vauxhall Bridge.
 
*15:30 Meet the group who started in [[London West Norwood|West Norwood]] at Vauxhall Bridge.
*15:45 Meet the groups who started at [[London Marble Arch|Marble Arch]], [[London Regents Park|Regents Park]], and [[London Kings Cross|Kings Cross]] at Belvedere Road (near the London Eye).
+
*15:45 Meet the groups who started at [[London Marble Arch|Marble Arch]], [[London Regents Park|Regents Park]], [[London Kings Cross|Kings Cross]], and [[London Tower Hill|Tower Hill]] on Westminster Bridge.
 
*17:30 Finish at Wellington Arch.
 
*17:30 Finish at Wellington Arch.
  

Revision as of 22:32, 6 April 2014

Home > List of rides > United Kingdom > London > London Clapham Junction •  Google London Clapham Junction WNBR

The London WNBR is part of Bike Week (15-23 June 2013).

Bike Week, 15-23 June 2013


Next ride

Editors: to change this section,
click the Edit tab at the top of the page

Date: Saturday 14 June 2014
Time: 14:45 assembly, for 15:00 departure
Location: Grant Road

Start point

We are meeting on Grant Road, just outside Clapham Junction railway station, in the pedestrian area next to The Church of the Nazarene.

The nearest exit from the station is via the underpass, near to platform 1. There are lifts from every platform to the overbridge, and from platform 1/2 to the underpass. So, if you don't want to carry your bike downstairs from a different platform, you can use 3 lifts:

  • From your platform to the overbridge.
  • From the overbridge to the end of platform 1.
  • From the middle of platform 1 to the underpass.

After you go through the ticket barrier, turn left. There's a ramp behind the door, giving you step-free access to the road outside.

Route

London Clapham Junction 2013 route.png

The coloured lines match the topological map:

  • The red line is just for our group.
  • The blue line is the merged route for both southern start points.
  • The green line is the merged route for all start points.

Timings

  • 14:45 Assemble for a ride briefing. Please keep your clothes on at this point, but you can use the time to decorate your bike, e.g. by attaching flags or signs.
  • 15:00 Undress and depart.
  • 15:15 Make a brief stop in Battersea Park (Carriage Drive North). If you want to wait for us there, that's fine, but please don't block the road or get undressed until we arrive.
  • 15:30 Meet the group who started in West Norwood at Vauxhall Bridge.
  • 15:45 Meet the groups who started at Marble Arch, Regents Park, Kings Cross, and Tower Hill on Westminster Bridge.
  • 17:30 Finish at Wellington Arch.

Body painting

There won't be any body painting facilities at Clapham Junction. If you want to use body paint, please do it at home and then put your clothes on over the top.

Toilets

If you come by train, you may want to use the toilets on your train (free of charge). There are also toilets inside the station (20p charge), in the underpass and on the overbridge by platform 17.