Difference between revisions of "London Clapham Junction"

From World Naked Bike Ride
Jump to: navigation, search
(Start point: UPDATED TIME (sorry, I don't seem able to edit the main listing still showing the the old time))
m (Updated start time)
Line 8: Line 8:
 
<br style="clear: both;" />
 
<br style="clear: both;" />
  
{{Ride location next ride|Date=Saturday 13 June 2015|Time=14:45 assembly, for 15:00 departure|Location=Grant Road}}
+
{{Ride location next ride|Date=Saturday 13 June 2015|Time=14:30 assembly, for 14:45 departure|Location=Grant Road}}
  
 
==Start point==
 
==Start point==
 
NOTE THE START TIME LISTED ABOVE IS INCORRECT.  PLEASE ASSEMBLE FROM 2:30 FOR 2:45 DEPARTURE.
 
  
 
We are meeting on Grant Road, just outside Clapham Junction railway station, in the pedestrian area next to The Church of the Nazarene.
 
We are meeting on Grant Road, just outside Clapham Junction railway station, in the pedestrian area next to The Church of the Nazarene.

Revision as of 15:58, 2 June 2016

Home > List of rides > United Kingdom > London > London Clapham Junction •  Google London Clapham Junction WNBR

The London WNBR is part of Bike Week (13-21 June 2015).

Bike Week, 13-21 June 2015


Next ride

Editors: to change this section,
click the Edit tab at the top of the page

Date: Saturday 13 June 2015
Time: 14:30 assembly, for 14:45 departure
Location: Grant Road

Start point

We are meeting on Grant Road, just outside Clapham Junction railway station, in the pedestrian area next to The Church of the Nazarene.

The nearest exit from the station is via the underpass, near to platform 1. There are lifts from every platform to the overbridge, and from platform 1/2 to the underpass. So, if you don't want to carry your bike downstairs from a different platform, you can use 3 lifts:

  • From your platform to the overbridge.
  • From the overbridge to the end of platform 1.
  • From the middle of platform 1 to the underpass.

After you go through the ticket barrier, turn left. There's a ramp behind the door, giving you step-free access to the road outside.

Route

London Clapham Junction 2013 route.png

The coloured lines match the topological map:

  • The red line is just for our group.
  • The blue line is the merged route for both southern start points.
  • The green line is the merged route for all start points.

This document has step by step instructions.

Timings

  • 14:30 [NEW] Assemble for a ride briefing. Please keep your clothes on at this point, but you can use the time to decorate your bike, e.g. by attaching flags or signs.
  • 14:45 [NEW] Undress and depart.
  • 15:00 Make a brief stop in Battersea Park (Carriage Drive North). If you want to wait for us there, that's fine, but please don't block the road or get undressed until we arrive.
  • 15:00 Meet the group who started in West Norwood at Chelsea Bridge.
  • 15:30 Meet the groups who started at Hyde Park, Regents Park, Kings Cross, and Tower Hill.
  • 17:30 Finish at Wellington Arch.

Body painting

There won't be any body painting facilities at Clapham Junction. If you want to use body paint, please do it at home and then put your clothes on over the top.

Toilets

If you come by train, you may want to use the toilets on your train (free of charge). There are also toilets inside the station (20p charge), in the underpass and on the overbridge by platform 17.