Difference between revisions of "London Clapham Junction"
(Created page) |
(Added info about toilets and body painting) |
||
Line 20: | Line 20: | ||
After you go through the ticket barrier, turn left. There's a ramp behind the door, giving you step-free access to the road outside. | After you go through the ticket barrier, turn left. There's a ramp behind the door, giving you step-free access to the road outside. | ||
− | |||
− | |||
==Route== | ==Route== | ||
Line 40: | Line 38: | ||
*15:45 Meet the groups who started at [[London Marble Arch|Marble Arch]], [[London Regents Park|Regents Park]], and [[London Kings Cross|Kings Cross]] at Belvedere Road (near the London Eye). | *15:45 Meet the groups who started at [[London Marble Arch|Marble Arch]], [[London Regents Park|Regents Park]], and [[London Kings Cross|Kings Cross]] at Belvedere Road (near the London Eye). | ||
*17:30 Finish at Wellington Arch. | *17:30 Finish at Wellington Arch. | ||
+ | |||
+ | ==Body painting== | ||
+ | |||
+ | There won't be any body painting facilities at Clapham Junction. If you want to use body paint, please do it at home and then put your clothes on over the top. | ||
+ | |||
+ | ==Toilets== | ||
+ | |||
+ | If you come by train, you may want to use the toilets on your train (free of charge). There are also toilets inside the station (20p charge), in the underpass and on the overbridge by platform 17. |
Revision as of 00:55, 1 May 2013
The London WNBR is part of Bike Week (15-23 June 2013).
Next ride
Date: Saturday 8 June 2013
Time: 14:45 assembly, for 15:00 departure
Location: Grant Road
Start point
We are meeting on Grant Road, just outside Clapham Junction railway station, in the pedestrian area next to The Church of the Nazarene.
The nearest exit from the station is via the underpass, near to platform 1. There are lifts from every platform to the overbridge, and from platform 1/2 to the underpass. So, if you don't want to carry your bike downstairs from a different platform, you can use 3 lifts:
- From your platform to the overbridge.
- From the overbridge to the end of platform 1.
- From the middle of platform 1 to the underpass.
After you go through the ticket barrier, turn left. There's a ramp behind the door, giving you step-free access to the road outside.
Route
The coloured lines match the topological map:
- The red line is just for our group.
- The blue line is the merged route for both southern start points.
- The green line is the merged route for all start points.
Timings
- 14:45 Assemble for a ride briefing. Please keep your clothes on at this point, but you can use the time to decorate your bike, e.g. by attaching flags or signs.
- 15:00 Undress and depart.
- 15:15 Make a brief stop in Battersea Park (Carriage Drive North). If you want to wait for us there, that's fine, but please don't block the road or get undressed until we arrive.
- 15:30 Meet the group who started in West Norwood at Vauxhall Bridge.
- 15:45 Meet the groups who started at Marble Arch, Regents Park, and Kings Cross at Belvedere Road (near the London Eye).
- 17:30 Finish at Wellington Arch.
Body painting
There won't be any body painting facilities at Clapham Junction. If you want to use body paint, please do it at home and then put your clothes on over the top.
Toilets
If you come by train, you may want to use the toilets on your train (free of charge). There are also toilets inside the station (20p charge), in the underpass and on the overbridge by platform 17.